LOCATIONS
Scalable Capacity in Northern Virginia
Located just three milliseconds and 60 miles from Ashburn and less than a mile from the NAP of the Capital Region, at initial build-out, EdgeCore’s 1.4 million sq. ft. Culpeper, Virginia campus will be comprised of three 72 MW data centers designed to provide high-density power and low-latency connectivity through a variety of network providers. With initial power available in early 2028 from Rappahannock Electric Cooperative, EdgeCore’s Culpeper campus is a near-term solution for companies searching for scalable data center space in power and capacity-constrained northern Virginia.
Understanding that technology requirements have exploded as a result of AI and cloud applications, EdgeCore’s Culpeper campus was designed with power density as a priority. Within 1.4 million square feet of space, these data centers will initially support 216 MW of critical IT load and up to 432 MW in the future. Through our scalable design, we have the flexibility to quickly and efficiently support the current needs of our customers, while offering them space to grow along with their business requirements.
EdgeCore is committed to making a positive impact on the environment and the communities we build in.
EdgeCore’s Culpeper data center campus is located in the Culpeper Technology Zone (CTZ), a 690-acre campus designated to host data centers, public works entities and educational institutions supporting the county’s STEM initiatives. The CTZ was designed to promote business growth and employment throughout the county and was thoughtfully designed to consolidate power and fiber infrastructure.
In addition to designing our data centers to uphold green building standards, ensuring customers have access to renewable energy sources, and equipping our facilities with technology designed to minimize water and power usage, EdgeCore’s Culpeper campus includes a 30-acre conservation area.
Contact us to learn about our Culpeper data centers.
Land Area
120 acres
Total Building Area
Up to 1.4M sf
Power
216 MW Critical IT load
Connectivity
Geographic risk
Low risk
Location
Culpeper, VA
Building Size
Power
72 MW
Fit Out
Infrastructured shell, turn-key
Power Availability
Sustainability
Environment
Green building design
Amenities
Building Size
Power
72 MW
Fit Out
Infrastructured shell, turn-key
Power Availability
Sustainability
Environment
Green building design
Amenities
Building Size
Power
72 MW
Fit Out
Infrastructured shell, turn-key
Power Availability
Sustainability
Environment
Green building design
Amenities
UPS
N, N+1, and 2N configurations with lithium-ion batteries
Generators
Backup generators supporting N, N+1, and 2N configurations
Power availability
Fuel storage
48 hours of run-time at full capacity
Mechanical
Air-cooled
Lighting
Zoned lighting controls with dimmable LEDs
Facilities
MOPs / SOPs
Uptime
Power Availability
Security
Fencing
Surveillance
Tech Lounge
Staging Room
Office space
Parking
WiFi
Public WiFi available
Tools
Lobby
Secure waiting area for data center visitors
Smoke Detection
Sprinklers
Management