edgecore digital infrastructure

Reno Data Center Campus

Efficiently scale your IT infrastructure in close proximity to the Bay Area.
reno colocation centers
LOCATIONS  >  RENO, NV
EdgeCore’s Reno data center campus supports 180 MW of critical load across more than one million square feet of data center space. An on-site substation will provide power to five data centers planned for this campus, enabling deployment options including turn-key, powered shell, and build-to-suit solutions. With sub-three millisecond latency to the Bay Area, low-cost utility power including renewable options and a design PUE of <1.30, EdgeCore’s Reno campus offers an intelligent solution to mission-critical customer requirements.
northern virginia data centers

5 Data Centers

northern virginia colocation centers

1,130,000 Sq. Ft.

virginia data centers

180 IT MW

northern virginia connectivity

Utility power available Q1 2024

3ms Latency and Geographic Diversity

Situated just 250 miles east of Silicon Valley via I-80, EdgeCore’s Reno data center campus boasts 6ms round-trip latency to the Bay Area. Direct access to several major fiber routes provides redundancy and resiliency to support this low-latency performance and enables the high-bandwidth requirements of leading enterprises. Reno’s geographic location in a less-volatile seismic zone further incentivizes customers searching for an alternative data center deployment locale.
data centers

Utilizing Efficiency Throughout the Reno Campus

EdgeCore’s purpose-built facilities in Reno will be designed, constructed, and outfitted to ensure reliability, security and the highest-level of performance for our customers’ data center deployments. The design supports N, N+1 and 2N infrastructure configurations and uses high-quality equipment including Cummins generators and lithium-ion UPS systems. Each facility is supported by 24×7 on-site facility and security teams as well as multiple layers of physical security.

The difference of a few cents per kilowatt can mean millions of dollars saved in data center transactions.

Compelling Cost Savings

Data center customers in Reno can expect an average TCO that is 31% lower than a comparable deployment in the Bay Area. This cost savings is driven by the low utility costs in Reno, which average 30-50% less than utilities in California, the lack of corporate and personal income tax in Reno, and the lower median price of land in Nevada.

Specifications